2012年7月25日星期三

Shot blasting machine blade molding and pouring

Shot blasting machine blade molding and pouring
With the prearranged sand box hand modeling, but should pay attention to the reasonable gating system opening and the use of cold iron, strictly according to the process map.Check carefully before closing the box cavity is open, to ensure that the iron liquid when pouring temperature, should follow the principle of low temperature casting furnace.If the pouring temperature is too high, not easily burnt out cold iron, and iron liquid greater shrinkage, easy to produce forging defect, so the pouring temperature is not too high, the general election in 1380-1420 ° C.Pouring time after open sand box, so as to obtain fine grain material microstructure.Abrasion resistance of high chromium cast iron in the shot blasting machine blade after application, leaf lifespan can be above 400h.Cold iron on the surface of the blade is chilled, not only to achieve the progressive solidification, but also on the blade surface produces a dense and homogeneous fine grains.More due to reasonable heat treatment process with comprehensive function, makes the blade is obviously play, thereby protecting the blades can time bear the grit of repeated shocks, show good wear resistance and long service life.Application of broad.

没有评论:

发表评论